ANOTHER MOONPOOL DOOR FABRICATION ORDER FROM OVERSEAS
In spite the downturn in the oil & gas market, AlphaECC was still placed with a new PO for fabrication of Moonpool door from one of its major clients in Europe.
Past performance by AlphaECC has contributed to the latest order. This is the second package for this type of product, including 43 tons structure in accordance with ISO 13920-AE and ISO 2768-mK-E. The equipment is operated with a hydraulic control system. Strict fabrication process ensures that quality, precision and aesthetics requirements are met.
Despite the tight delivery schedule of four months, including material procurement and fabrication, we are totally confident in perfect delivering, similar to what it did before for this client.
OTHER PROJECTS