Dong Xuyen Industrial Zone, Rach Dua Ward, Vung Tau City, S.R. Vietnam
info@alpha-ecc.com






FABRICATION OF LOAD-OUT SUPPORT FRAME FOR VIETSOVPETRO TOPSIDE BK-TNG


After 6 months of fabrication, Alpha ECC completed the fabrication stage of a load-out support frame for Vietsovpetro Topside BK-TNG.

This 700 tons section includes: A load-out support frame for Thien Ung topside’s load-out (35m x 25m) and a skid ways with skid beam, support can and accessories (75mx5m).

The frame met VSP’s strict requirements.


OTHER PROJECTS