News

Topic:

ALPHA-ECC (MYANMAR BRANCH) SUPPORTS LOCAL COMMUNITY IN YANGON IN COVID-19 TIMES

Covid-19 has been a special challenge for Myanmar, Hence a charity was internally organized to partially support local people to help them in such difficult time

COMPLETION OF A GPP’S WET GAS STATION – NCSPII, A SUCCESS BEYOND CLIENT’S EXPECTATIONS

This EPC contract has taken place within 6 months, from contract signing until delivery save a 2-day non-stop operation for the plant, with non-LTI record.

CIS-CHEMICAL INJECTION SKID SAFELY ARRIVED TO A REDEVELOPMENT PROJECT IN DANISH NORTH SEA

This 78-ton complete skid (15,500x6,040x8,895) was accomplished in 35 weeks

FINAL DELIVERY OF PRESSURE VESSELS SERIES FOR A LOCAL PETROCHEMICAL PROJECT

A large number of pressure, process vessels (about 50 ea), has been successfully completed and delivered to a Petrochemical complex

FOUR SETS OF HRSG TUBE BUNDLES COMPLETED FOR ASSEMBLY

As the “heart” of the Heat Recovery Steam Generator – HRSG, Heat exchange tube sections (bundle) were fabricated and assembled in separate workshops with special care

ANOTHER FERRIS WHEEL FOUNDATION DELIVERED

Being well proved in high quality & good schedule, we have completed & delivered another project of Ferris wheel foundation, over 900MT, all the way to Russia

ASME STAMPED VESSELS (FILTER ELEMENT) FOR LOCAL OFFSHORE DEVELOPMENT

One of last parts of full package for a local key oilfield development has been successfully completed and delivered to site installation

S-STAMPED VESSELS (STEAM DRUMS) READY FOR INSTALLATION

These are among the pressured parts of the four-full HRSG (Heat Recovery Steam Generator) packages being built in our own facility

DELIVERY OF A PROCESS SECTION FOR THE STEEL PRODUCING

In total 5 process section parts for cleaning steel sheet, with a total weight at over 70 tons, had recently finished fabrication in Alpha ECC, Workshop 4

Total : 56 Pages 15/7 : [ 1 ] [ 2 ] [ 3 ] [ 4 ] [ 5 ] [ 6 ] [ 7